Leveraging our core and differentiated strengths, we provide you with high-quality, comprehensive technology services
More
We provide professional optical product testing services (laser product safety testing and performance parameter testing, photobiological safety testing for non‑laser products), as well as energy efficiency testing services (EU ErP energy efficiency testing, US DOE energy efficiency testing, California CEC energy efficiency testing), among others.
If you have requirements for laser products (laser product safety testing and laser performance parameter testing) and energy efficiency testing (EU ErP energy efficiency testing, US DOE energy efficiency, California CEC energy efficiency, UK energy efficiency testing), please feel free to email us at: admin@ctnt-cert.com
Clarify the position of EN 60204‑1 within the CE‑LVD framework – it is the core harmonised standard for machinery products to meet the safety objectives of the Low Voltage Directive.
Mandatory nature of the LVD Directive: Briefly describe the scope of the EU Low Voltage Directive (2014/35/EU) (AC 50–1000 V, DC 75–1500 V), noting that the electrical systems of machinery equipment fall within LVD jurisdiction as long as they operate within this voltage range.
The role of EN 60204‑1: As the "constitutional-level" standard for machinery electrical safety, EN 60204‑1 provides specifications for the design, manufacture, and verification of electrical equipment. A test report issued in accordance with this standard is key technical evidence proving that the product meets the essential safety requirements of the LVD.
Before applying for a report, the standard version must be confirmed. We are currently in a critical window period of transition between the old version and the new version.
Current effective version: EN 60204‑1:2018+A1:2025 has been published, but the original 2018 version will be formally withdrawn on 30 April 2028.
Impact on report applications: Before this date, manufacturers may still apply for testing under the 2018 version (including the A1 amendment), but must plan the product launch cycle well. If the product lifecycle is long, it is recommended to directly target the new amendment requirements, with particular attention to clauses that have changed from recommended to mandatory, such as wireless control system safety (requiring compliance with IEC 62745) and emergency stop reset devices.
Report validity note: Although test reports have no absolute "validity period", if the product standard version becomes invalid, Notified Bodies or buyers may require supplementary difference testing.
EN 60204‑1 testing focuses on "protection against electric shock" and "effectiveness of protective circuits", which differs from ordinary household appliances or IT products.
Continuity testing of protective bonding circuits: Verifies low-impedance connection between all exposed conductive parts (e.g., cabinet doors, motor housings) and PE terminals. This is the first line of defence against indirect contact electric shock.
Loop impedance testing and overcurrent protection verification: Verifies whether the fault loop impedance is sufficiently low to ensure that, in the event of a short circuit, the circuit breaker or fuse can cut off the power supply within the specified time (automatic disconnection protection).
Insulation resistance test: Measures the resistance between power circuits and protective bonding circuits at 500 V DC, typically requiring not less than 1 MΩ (certain components such as busbars may be relaxed to 50 kΩ as exceptions).
Dielectric strength test (withstand voltage): Applies at least 2 times the rated voltage or 1000 V (whichever is greater) for at least 1 second to verify no insulation breakdown.
Residual voltage protection: Verifies whether residual charge on plugs or terminals after power disconnection can be discharged to a safe level within the specified time.
Functional testing: Verifies the operational reliability of safety-related control functions (e.g., emergency stop, safety door monitoring).
The process is highly standardised, but the quality of preliminary technical documentation directly determines the length of the cycle.
Step 1: Determine applicability and standard. Confirm that the product voltage is within the LVD range and that it is fixed industrial machinery (non-household, non-handheld). Confirm EN 60204‑1 as the main standard.
Step 2: Technical documentation preparation (key stage). Must submit: electrical schematics, component list (BOM, key components must have CE/UL certificates), risk assessment report (EN ISO 12100), and user manual (including safety warnings). Incomplete documentation or inconsistency with the sample is the main cause of corrective delays.
Step 3: Sample submission and testing. Typically 1–2 complete prototypes are required. The laboratory conducts the tests in Section III above in accordance with the standard. If frequency converters or complex drive systems are involved, additional attention must be paid to the impact of harmonics and leakage current on testing.
Step 4: Corrective actions and re‑testing (if any). Common non‑conformities are concentrated in: earthing studs not treated with anti‑loosening measures, insufficient creepage distance at wiring terminals, and emergency stop button colour or reset method non‑compliance.
Step 5: Report issuance. After passing the tests, the laboratory issues a Test Report. This report, together with the technical documentation, is used to prepare the CE Declaration of Conformity (DoC).
Distinguish between "test report" and "certificate", and clarify the relationship with the Machinery Directive.
Report ≠ certificate: The LVD Directive generally allows manufacturer self-declaration, but for market acceptance and risk transfer, the vast majority of machinery companies commission third‑party laboratories to issue test reports as technical support. The EN 60204‑1 report itself is not a "CE certificate"; the legality of the CE mark derives from the complete conformity assessment procedure (including the DoC).
Synergy with the Machinery Directive (MD): If the complete machinery requires CE‑MD certification, the electrical testing of EN 60204‑1 is typically a sub‑item of the electrical safety part of MD certification. When applying for an LVD report, EMC testing (such as EN 61800‑3 or the EN 61000‑6 series) can be considered simultaneously to avoid duplicate sample submissions during complete machine certification.
Importance of key components: Although the report is for the complete machine, if the contactors, circuit breakers, or power modules selected do not have the corresponding certifications, the test pass rate will be significantly reduced. It is recommended to lock in key components with VDE/UL/ENEC certification at the R&D selection stage.
The EN 60204‑1 test report is one of the "safety passports" for machinery electrical equipment entering the EU market. Before the mandatory standard transition in 2028, it is recommended that manufacturers combine product iteration cycles and design and verify in accordance with the latest amendment requirements as early as possible, to reduce the sunk costs of subsequent compliance version transitions.
Shenzhen Zhongwei Inspection is a professional third‑party testing and certification body, operating an internationally recognised electrical safety laboratory with multiple laboratory accreditations including CMA, CNAS, and IAS. It has long provided EU CE‑LVD testing services to domestic and international customers and assists customers in obtaining EN 60204‑1 test reports.
Our company is proficient in EU Machinery Directive regulations, with particularly outstanding testing capabilities for CE‑LVD testing of industrial laser equipment.
If you have machinery equipment requiring CE‑LVD testing, welcome to contact us for related services!
California Energy Efficiency Certification – Specialised SolutionFocused on meet
Complete U.S. Energy Efficiency Compliance SolutionFully addressing U.S. Departm
Complete EU Energy Efficiency Compliance SolutionOne‑stop solution covering all