Leveraging our core and differentiated strengths, we provide you with high-quality, comprehensive technology services
More
We provide professional optical product testing services (laser product safety testing and performance parameter testing, photobiological safety testing for non‑laser products), as well as energy efficiency testing services (EU ErP energy efficiency testing, US DOE energy efficiency testing, California CEC energy efficiency testing), among others.
If you have requirements for laser products (laser product safety testing and laser performance parameter testing) and energy efficiency testing (EU ErP energy efficiency testing, US DOE energy efficiency, California CEC energy efficiency, UK energy efficiency testing), please feel free to email us at: admin@ctnt-cert.com
Not only major marketplaces including Amazon and eBay mandate valid DOE certification, US Customs will detain or return shipments of non-compliant products.This article provides a full breakdown of the entire DOE certification process for chargers to help your goods enter the US market smoothly.

No-load power consumption shall be below 0.1 W for units rated ≤250 W, or 0.21 W for units rated over 250 W
Average active efficiency must reach specified thresholds based on product power rating and voltage type
External Power Supplies (EPS): Mobile phone chargers, laptop power adapters and adapters for all types of household appliances
Battery Charging Systems (BCS): Bluetooth earbud charging cases, power banks, power tool chargers, vacuum cleaner charging docks and all battery-equipped charging devices
Governing Regulations: 10 CFR 429 (sampling and reporting requirements), 10 CFR 430 (standard test methods)
Test Protocols
External Power Supplies: 10 CFR 430, Subpart B, Appendix Z
Battery Chargers: 10 CFR 430, Subpart B, Appendix Y
Energy Efficiency Class: External power supplies must satisfy Level VI requirements; battery chargers follow the latest DOE test procedures without a designated class rating, with full energy consumption data required in test reports.
Submit a minimum of 2 complete samples with full circuit assemblies and permanent nameplates to an accredited laboratory
Test items include input/output performance, no-load power draw, operational efficiency and power factor
Standard test lead time: approximately 5 working days
A minimum of 2 finished test samples
Full product technical datasheets including circuit diagrams, BOM and key component lists
Permanent product nameplates displaying model number, rated voltage, current and frequency
Official DOE application form provided by the testing laboratory
Complete contact details of US-based importer or manufacturer (required for DOE registration submission)
Professional pre-testing services to rapidly diagnose energy efficiency flaws and prevent formal test failures
Streamlined parallel testing and registration workflows cutting total lead time by 30% versus industry averages
Dedicated one-on-one technical guidance covering sample preparation, document sorting and full registration submission
Long-term ongoing compliance support including annual random inspection reminders and regulatory update alerts to maintain continuous market eligibility
California Energy Efficiency Certification – Specialised SolutionFocused on meet
Complete U.S. Energy Efficiency Compliance SolutionFully addressing U.S. Departm
Complete EU Energy Efficiency Compliance SolutionOne‑stop solution covering all